Excavation around a foundation is one of those sites where what happens in the first two days determines the success of the next two weeks. Poorly protected land, a poorly located drain, too much depth at once: each of these initial mistakes turns a waterproofing project planned for five days into a fifteen-day project. Understanding the steps allows you to ask the right questions to the contractor before the shovel hits the ground. To plan a foundation crack treated from the outside, excavation is the item that requires the most rigor.
Excavation preparations
Once the site has been selected and documentation is ready, preparations for excavation can begin. First, a site plan must be established to ensure accurate and efficient excavation. To do this, scientists start by drawing a grid in the field. In some cases, topographic surveys are also carried out to document site contours and viewpoints. The landmarks are then used to determine the size and depth of each excavation quadrat. Once the site is divided into small areas, detailed stratigraphy can be established to assist in the cutting and classification of terrain layers. Layers are generally classified according to their color, texture, mineral content, and other characteristics. Buried artifacts are collected from the ground and stored separately for later analysis. Scientists also collect samples of soil, pebbles and even plants for their characteristics such as chemical composition or radiometric dating date. The findings are carefully recorded for future analysis.
Site preparation
The site preparation stage is an important step in the excavation process. This step involves preparing the site for excavation, creating a plan for the site and identifying natural and constructed obstacles. It is important to recognize and prepare the site to ensure that excavation is smooth and that the work is done safely. To get started, it’s important to take a good look at the terrain. A qualified professional can perform a topographical and geological examination of the soil, which helps identify obstacles and difficulties that may arise during excavation. Different planning steps are then required to determine the best way to proceed. These steps include determining the locations of boreholes, ditches and drains, as well as creating a plan to manage the wastewater and waste produced by the excavation. Once the plans have been developed, they must be approved by the owner of the land before the work begins.
Opening and checking the area to be dug
Opening and checking the area to be dug are the first steps in excavation. They are essential and require special attention. The opening of the area to be dug consists of tracing the shape and dimensions required for digging. Accuracy is essential, as it is important for the success of the excavation. Once the route has been made, a survey can be carried out to verify the profile of the area to be dug and the presence of materials in the soil. This makes it possible to know the properties of the soil and the depth at which it is necessary to dig. If obstacles arise then additional measures must be taken which may include digging through the ground, removing materials or using specialized equipment. Once the survey is complete, precision beacons can be installed to ensure the accuracy of the plot. Checking the opening is important to ensure that the excavation is low risk and to avoid errors.
Data collection and analysis
Data collection and analysis are two key elements of any excavation project. Indeed, to fully understand an archaeological site, it is essential to collect and analyze information about the archaeological site and its context, which requires the collection and analysis of information. Data collection is done using a variety of methods such as online surveys, interviews, library research, topographic surveys and preliminary excavations. These methods are fundamental because they allow the archaeologist to determine the importance and nature of the archaeological site. Once the information is collected, the archaeologist will proceed to analyze the data and information collected. Data analysis may include analysis of artifacts found, information about strata and contexts of sites, and research into the history and culture of archaeological sites. This data analysis can help archaeologists better understand the site and build a better understanding of its history and significance. Once data collection and analysis is complete, the archaeologist can then move on to the next stages of excavation.
Structural protection and waste clean-up
The excavation steps include a number of critical processes to ensure that the work is done correctly and safely. The first step is to protect existing structures. This includes protecting existing systems and equipment, such as water pipes, pipes, sewage systems, electrical installations and retaining walls. All areas should be properly marked and protected before excavation begins to prevent deterioration or damage. Once excavation is complete, it is important that waste and materials are thoroughly cleaned and removed. Waste may include stones, sediments, and inorganic or organic materials. Care must be taken to ensure that chemicals, heavy metals and other harmful substances are properly treated and removed from the site. Waste should be transported in suitable containers and deposited at a recycling centre or landfill for sorting and recycling.
Steps of a typical excavation
Here is the standard sequence of an excavation site around a residential foundation in Quebec.
| Stage | Typical | Associated risk |
|---|---|---|
| Location of services (Info-Excavation) | 3 to 5 days in advance | Gas breakdown, electricity |
| Protection of the land | A few hours | Damaged landscaping |
| Excavation to the footing | 1 to 2 days | Collapse, flooding |
| Work (membrane, drain) | 2 to 4 days | Rain during the construction site |
| Backfilling and compaction | 1 day | Future compaction if poorly done |
Frequently asked questions about foundation excavation
Should we always have the services located before excavation?
Yes, it’s even mandatory in Quebec. Info-Excavation is a free service that must be contacted at least three business days before the start of the work to avoid damage to underground networks.
How deep is the excavation to reach the footing?
In general, 1.5 to 2.4 metres for a Quebec residential home, sometimes more for high-ceiling basements or raised bungalows. The exact depth is verified by probing a point before the shovel.
What to do if a major rain is forecast in the middle of the construction site?
Cover the trench with an impermeable tarp and install a construction pump in the bottom. An excavation left open in the rain may partially collapse and require rework.
How long does it take after backfilling to replant the lawn?
Ideally, wait until the snow melts completely after the work to allow the soil to settle. Replanting too soon forces you to start again after natural compaction.